Bathroom remodels for Scarsdale's pre-war Tudors, Colonials and Mediterraneans, from hall baths still wearing their original tile to primary suites carved out of a dressing room. We level the floor, waterproof properly and choose finishes that suit the house, with the owner on site until the final walk-through.
Many Scarsdale bathrooms are as old as the houses around them. Small hex or subway tile sits in a mortar bed several inches thick, the tub is cast iron, and the plumbing has been repaired piece by piece for decades. Some of that tile is handsome, and a few rooms deserve restoring. Most, though, have floors that sag and walls that have quietly let water through.
Rebuilding one of these rooms means removing the heavy mortar bed, checking and leveling the joists beneath it, and replacing old supply and drain lines before anything new goes in. Then we waterproof the shower and choose finishes that belong in a 1920s house, from white marble and nickel fixtures to warm patterned floor tile. That structural work is priced up front, not discovered halfway through.
Find the one closest to yours. Your free estimate covers the scope that fits your house and budget.
Larger scope
Primary suite from a dressing room
In many Scarsdale homes the primary bath is small but sits beside a dressing room or large closet. Joining the two makes space for a double vanity, a walk-in shower and sometimes a freestanding tub.
Usually involves
Reframing walls between bath and closet
Leveling the floor for large tile
Relocating drains to the new layout
Mid scope
Original-tile hall bath
Hall baths with their 1920s tile and a cast-iron tub are common here. Depending on condition, we rebuild them in a period style or update them fully, always on a level, waterproofed base.
Usually involves
Removing the old mortar bed
A new or reglazed tub
Period-style tile, or a modern palette
Smaller scope
Center-hall powder room
A first-floor powder room in a center-hall house is seen by every guest. Wallcovering, a furniture-style vanity and good lighting give that small room real presence on a modest budget.
Usually involves
A pedestal sink or furniture vanity
Wallcovering or painted paneling
A pair of sconces or a statement fixture
From demolition to the last fixture, the owner is in the house, not on the phone.
Budget
Rough Budget Ranges for a Scarsdale Bathroom
These are rough averages across typical Westchester bathroom remodels, not a quote. Your bathroom could
come in lower or higher, and smaller updates often cost well under these ranges. The real number comes from a
free visit to your home.
Hall or guest bath
Usually new tile, vanity, fixtures and glass, with the layout mostly as it is.
roughly $20,000–$35,000
Primary bathroom
Usually a reworked layout, a larger shower, premium tile and stone, and often heated floors.
roughly $40,000–$70,000+
Smaller jobs, like a new vanity, fixtures and paint, or reglazing in place of new tile, often come in well under these ranges. We're glad to price a focused update as well as a full remodel.
What moves the number
In Scarsdale, the floor and walls you cannot see yet often decide a bathroom budget more than the tile you pick.
Leveling or reinforcing the floor Larger effect
Thick mortar-bed floors over sagging joists are common in pre-war Scarsdale baths and must come out before tile.
Tile choice and how much of the room it covers Larger effect
Marble, patterned floors and full-height wall tile suit these houses, and each adds both material and labor.
Replacing old supply lines and drains Moderate effect
Galvanized supply and cast-iron stacks from the original build are usually replaced in any wall that gets opened.
Moving the toilet, shower or drain Moderate effect
Joining a bath and closet usually moves the shower drain, and sometimes the toilet, across old framing.
Vanity, fixtures and glass Smaller effect
Period-style faucets, a console vanity or a refinished clawfoot tub vary widely in what they cost.
We look at the bathroom with you, check what we can of the plumbing and ventilation, and talk through how the room gets used.
2Design & estimate
Layout, tile and fixtures chosen together, then an itemized estimate so you can see where the money goes.
3Ordering
Tile, vanity, fixtures and glass are ordered. Custom glass is measured after tile and is often the last thing in.
4Build
Demolition, plumbing and electrical, waterproofing that is tested before tile, then tile, vanity and fixtures, with the owner on site.
5Walk-through
We walk the finished bathroom together, check every fixture, and close out the punch list before we call it done.
A full bathroom remodel typically takes 3–6 weeks once work starts. A smaller hall or guest bath is often closer to 3–4 weeks. In Scarsdale, removing an old mortar-bed floor and squaring up the framing beneath it is the step most likely to add days.
All timelines are estimates only and subject to change based on the final project scope, material lead times,
and site conditions.
Design Choices
Bathroom Choices for a Scarsdale Tudor or Colonial
Period or modern
A bathroom does not have to copy 1925 to suit the house. Many owners keep the period cues that matter, like a black-and-white floor, nickel fixtures and painted trim, and pair them with a modern shower and real ventilation. A fully contemporary room can also work if the casings stay consistent.
Tile with weight
Older Scarsdale houses carry heavier materials well. Honed marble, small hex or basketweave floors and handmade-look wall tile feel at home, while large glossy porcelain can look out of place. Where budget matters, spend on the floor or one feature wall and keep the rest simple.
Trim and openings
Door casings, window trim and arched openings in these houses have particular profiles. Matching them inside the bathroom, and choosing a vanity with furniture-style legs or panels, makes the new room read as part of the house rather than a later insertion.
Planning Your Project
Before You Start
Leveling an old floor
Decades of settling leave many Scarsdale bathroom floors out of level. Where needed, we sister or shim the joists so new tile stays flat and the grout lines do not crack under load.
Plumbing you cannot see yet
Galvanized lines and cast-iron stacks are common in pre-war houses. We replace failing pipe in the walls we open and show you what we find elsewhere before you decide whether to go further.
Approvals and the rest of the house
Requirements vary by town and project, particularly when a layout changes. We know what a bathroom like yours is likely to need and help you navigate the process, and we protect stairs, banisters and original floors along the work path.
How much does a bathroom remodel cost in Scarsdale?
In Scarsdale, what lies under the old tile, such as a thick mortar bed or sagging joists, often matters as much as the finishes. As a rough guide, a hall or guest bath often lands around $20,000 to $35,000, and a primary bathroom around $40,000 to $70,000 or more. Those are averages, not a quote, and your bathroom could come in lower or higher. A free in-home visit gives you an itemized number.
Can you keep my original 1920s tile?
Sometimes. If the tile is sound and nothing behind it is wet, we can work around it and update the fixtures. More often the tile has cracked or the base beneath it has failed, and a faithful new version is the better choice. We will tell you honestly which you have.
Can you make a small primary bath bigger?
Often, by borrowing from an adjoining closet or dressing room, which many Scarsdale homes have beside the primary bedroom. Moving a wall and a drain is real work, so we look at the framing and the plumbing route at the estimate before we suggest it.
Should a bathroom in an old house look old?
Not necessarily. The rooms that age best usually take a few cues from the house, such as the trim profile, a classic floor pattern and nickel or brass fixtures, then add a modern shower, ventilation and lighting. We can sketch both directions so you can compare.
Can we keep our cast-iron or clawfoot tub?
Often, yes. A sound cast-iron tub can be reglazed and reset, and a clawfoot can be refinished and reused. These tubs are very heavy, so moving one out of the room and back again is planned along with the rest of the demolition.
How long does a Scarsdale bathroom remodel take?
In Scarsdale, taking out an old mortar-bed floor and leveling the joists is the step most likely to add time. Most full bathroom remodels take 3 to 6 weeks once work starts, and a smaller hall or guest bath is often closer to 3 to 4, with a powder room sometimes less. These are estimates and subject to change based on scope, materials and site conditions.