Bathroom remodels for Ardsley households where one hall bath serves the whole family and the lower level still has its original half bath. We build tough, easy-to-clean rooms with real storage, sequence the work so you're not without a shower for long, and keep the owner on site throughout.
In Ardsley's split-levels and raised ranches, the bathroom count rarely matches the household. A single hall bath often serves two or three kids, the primary bath may be little more than a stall shower and a small vanity, and there is often a half bath or an unfinished corner on the lower level that has never been touched. Morning traffic, wet towels and steam are the real design brief.
Most Ardsley bathroom remodels keep the existing walls and work inside them. We choose tile that hides wear, replace a pedestal sink with a vanity that actually stores things, and duct a quiet fan outside so steam leaves the room. On the lower level, the first question is plumbing: whether a new or relocated drain can reach the sewer line by gravity, or needs a pump to get there.
Find the one closest to yours. Your free estimate covers the scope that fits your house and budget.
Mid scope
Shared hall bath
The hall bath that serves the kids takes more abuse than any other room in the house. A tub-shower with a durable surround, a double sink where the room allows and a drawer for each person keep mornings moving.
Usually involves
Tub with a tiled surround
Wider vanity, double sink if it fits
Ducted fan on a timer
Larger scope
Lower-level bath
Finishing or adding a full bath on the lower level gives teenagers, guests or a home office a room of their own. Whether the drain can flow to the sewer line by gravity sets the scope.
Usually involves
Drain depth checked at the estimate
An ejector pump if gravity won't work
Moisture-resistant board and flooring
Smaller scope
Small primary bath refresh
Primary baths in these homes are often compact, with a stall shower. New tile, a frameless glass door, a vanity with drawers and better light make the room feel new without moving a single pipe.
Usually involves
Stall shower retiled and re-glassed
Vanity with drawers and a medicine cabinet
Lighting at face height
One owner runs the job, answers your calls and checks the waterproofing before any tile goes up.
Budget
Rough Budget Ranges for a Ardsley Bathroom
These are rough averages across typical Westchester bathroom remodels, not a quote. Your bathroom could
come in lower or higher, and smaller updates often cost well under these ranges. The real number comes from a
free visit to your home.
Hall or guest bath
Usually new tile, vanity, fixtures and glass, with the layout mostly as it is.
roughly $20,000–$35,000
Primary bathroom
Usually a reworked layout, a larger shower, premium tile and stone, and often heated floors.
roughly $40,000–$70,000+
Smaller jobs, like a new vanity, fixtures and paint, or reglazing in place of new tile, often come in well under these ranges. We're glad to price a focused update as well as a full remodel.
What moves the number
In an Ardsley bathroom, the swing usually comes from whether plumbing moves and whether the lower level is involved.
Adding a bathroom where there wasn't one Larger effect
A new lower-level bath may need an ejector pump if its drain sits below the sewer line.
Moving the toilet, shower or drain Larger effect
Moving a toilet in a split-level or raised ranch often means opening the ceiling of the room below.
Tile choice and how much of the room it covers Moderate effect
Tiling a shared bath to full height costs more up front but cleans far easier than painted walls.
Vanity, fixtures and glass Moderate effect
A wider vanity with drawers for a shared family bath costs more than a basic single-sink unit.
Shower type: tub, low-curb or curbless Smaller effect
Keeping the tub in a kids' bath usually costs less than converting it to a walk-in shower.
We look at the bathroom with you, check what we can of the plumbing and ventilation, and talk through how the room gets used.
2Design & estimate
Layout, tile and fixtures chosen together, then an itemized estimate so you can see where the money goes.
3Ordering
Tile, vanity, fixtures and glass are ordered. Custom glass is measured after tile and is often the last thing in.
4Build
Demolition, plumbing and electrical, waterproofing that is tested before tile, then tile, vanity and fixtures, with the owner on site.
5Walk-through
We walk the finished bathroom together, check every fixture, and close out the punch list before we call it done.
A full bathroom remodel typically takes 3–6 weeks once work starts. A smaller hall or guest bath is often closer to 3–4 weeks. In Ardsley, lower-level drain work and keeping the only upstairs shower usable are what most often shape the schedule.
All timelines are estimates only and subject to change based on the final project scope, material lead times,
and site conditions.
Design Choices
What Holds Up in an Ardsley Family Bath
Tile that forgives
Mid-tone porcelain and a slightly darker grout hide soap marks and the odd muddy footprint far better than white on white. A matte or textured floor tile adds grip for small feet climbing out of the tub. Save glossy or handmade-look tile for one accent wall, where it's easy to wipe down.
Storage for several people
Drawers beat doors in a shared vanity, since each person can claim one. A recessed medicine cabinet, a shower niche for bottles and hooks in place of a single towel bar keep counters clear. In a narrow room, a wall-hung vanity frees up floor space for a step stool.
The lower-level room
Downstairs bathrooms in a split-level or raised ranch sit closer to grade, so moisture matters more. Cement board or a sealed membrane behind the tile, porcelain flooring rather than wood, and a fan that runs on a humidity sensor keep the room dry and free of that basement smell.
Planning Your Project
Before You Start
Sequencing around one shower
When the hall bath is the only full bath upstairs, we group the days it is completely out of service and tell you which ones in advance. Families often plan around the lower-level bath, a gym membership or a few days away.
Checking the drain before design
For any lower-level work, we find where the sewer line leaves the house and how deep it runs. That one measurement decides whether a new shower or toilet can drain by gravity or needs a pump.
Approvals for added fixtures
Adding a bathroom or moving fixtures raises questions that a straight replacement doesn't. Requirements vary by town and project. We know what a bathroom like yours is likely to need and help you navigate the process.
In Ardsley, cost turns mostly on whether pipes move and whether the job reaches the lower level. As a rough guide, a hall or guest bath often lands around $20,000 to $35,000, and a primary bathroom around $40,000 to $70,000 or more. Those are averages, not a quote, and your bathroom could come in lower or higher. We'll come out for a free in-home estimate and give you an itemized number.
Can you add a full bathroom to our lower level?
Often, yes. The deciding factor is where the sewer line exits the house. If a new shower and toilet can drain to it by gravity, the job is straightforward. If they sit too low, an ejector pump handles it. We measure at the estimate.
Should we keep the tub in the kids' bathroom?
With young children, usually yes, since bathing a toddler in a walk-in shower is hard. Many families keep one tub in the house and convert the primary bath to a shower. Once the kids are older, a walk-in shower in the hall bath can make sense.
Will we be without a shower during the remodel?
For part of it, if the hall bath is the only full one upstairs. We bunch the demolition, plumbing and waterproofing days together so that stretch is as short as we can make it, and we give you the dates before we start.
Our lower-level bathroom smells musty. Can a remodel fix that?
Usually. Musty smells downstairs often come from a fan that vents nowhere, a dried-out floor drain trap or moisture trapped behind old tile. We find the source once the walls are open, then rebuild with moisture-resistant materials and a fan ducted outside.
How long does an Ardsley bathroom remodel take?
A lower-level bath that needs new drains takes longer than a hall bath that keeps its fixtures. Most full bathroom remodels take 3 to 6 weeks, and a smaller hall or guest bath is often closer to 3 to 4. These are estimates and subject to change based on scope, materials and site conditions.